One qualified control cell
A single non-safety-critical Rockwell cell, scoped and confirmed before kickoff.
One qualified, non-safety-critical Rockwell control cell. Ninety days. Your maintenance team learns to answer its own PLC faults: cited to the exact rung, verified in the field, with a human controls engineer behind them when the evidence runs out.
BlueRidgePLC will confirm vendor, controller generation, cell criticality, safety boundary, and available L5X export, usually within two business days.
A single non-safety-critical Rockwell cell, scoped and confirmed before kickoff.
Your Studio 5000 export parsed into a navigable control graph of tags, routines, and rungs.
A dedicated workspace for your cell: your logic, your evidence, your incident record.
The people who actually stand at the cabinet get their own access.
Five engineer-reviewed scenarios that define what “working” means for your cell, tested, not assumed.
Bounded read-only field checks your technicians complete in a browser.
Every fault, check, and outcome for the pilot cell retained as reusable evidence.
A human controls engineer reviews escalations on a scheduled basis, not a 24/7 promise.
What the engine answered, what it couldn’t, and what your team verified, yours to keep.